March 24 to
April 18, 2008 (spring 2008
)

September 29 to
October 26, 2008 (fall 2008)


March 30 to
April 24, 2009 (spring 2009
)

October 5 to
October 30, 2009 (fall 2009)

· Pre Employment Industry Training

· Owner/Builder Skills

· 4 Weeks
(160 hrs.)

· Author/Instructor


Certificate Awarded

Skills Report
Card

ISBA Tshirt

Tuition:
$2100.00 Cdn.

Tool Pkg. Req'd.




I came looking (leaving the Corporate Rat Race) for a better way to work/learn/play. It is here (on this Island and at this School). Much more is taught than just chisels, chainsaws and construction...

I will use the knowledge I gained here as a guiding reference in the second half of my life. The past three months have been a blur because I couldn't wait to start each day- I want this feeling to continue...I love architecture, nature, organic methods of building and the satisfaction of seeing the results of your effort each day.-

John Cox, Raleigh, North Carolina



Timber Post & Beam 2008-2009

Modular Grid Layout/Joinery


Timber Post & Beam: Modular Grid Layout/JoineryAuthor James Mitchell ’Craft of Modular Post&Beam’, teaches Timber frame Post & Beam using a Centerline Grid Layout and Traditional Joinery. James then shifts gears and employs Template Layout for producing Modular Timber components that are interchangeable.

Students learn to Plan, Layout and Construct a Post & Beam Building from Foundation to Roof using a variety of hand and power tools. Methods of infill types are explored; including organic log piece-en-piece and straw bail and synthetic expanded polystyrene and acrylic stucco.

Week 1: Drafting Blueprints/Shopdrawings; Wood Tech.; Tool Use&Safety; Knee Brace Layout and Joinery.

Week 2: Traditional Square Rule Layout; Post Layout, Mortise&Tenon Joinery; Beam Layout, Corner Dovetail and Shouldered-Lap Joinery.

Week 3: Template Layout, Post & Beam Joinery; Modular Component construction; Roof Layout.

Week 4: Roof System Construction; Structural Beam Sizing; P&B Frame Assembly; Infill versus Envelope Wall Systems; Wood Finishing.

Semester Option / Apprentice Option / U-Build Option

 

See: Log Tool Package Requirement/Rental

See Also:   
Timber Post & Beam - Fall Class of '07 Photos

Timber Post & Beam - Spring Class of '07 Photos

Timber Post & Beam - Fall Class of '06 Photos

Timber Post & Beam - Spring Class of '06 Photos

Timber Post & Beam - Fall Class of '05 Photos  
Timber Post & Beam - Spring Class of '05 Photos
'Timber Post & Beam' Fall Class of '04 Photos

'Timber Post & Beam' Spring Class of '04 Photos
'Timber Post & Beam' Fall Class of '03 Photos

For more P&B info refer to: Post & Beam Construction Info

Click here to register online

Timber Post & Beam: Modular Grid Layout/Joinery

Timber Post & Beam: Modular Grid Layout/Joinery

Timber Post & Beam: Modular Grid Layout/Joinery
 
 
Timber Post & Beam: Modular Grid Layout/Joinery

Click here to register online

For more information or registration contact:
www.LogandTimberSchool.com
or call 1 250 247-8922
Island School Of Building Arts
3199 Coast Rd, Gabriola Island,
British Columbia, Canada V0R 1X7

Email: info@logandtimberschool.com

Back to the Course Calendar




Copyright ©2005 Island School of Building Arts
Site design by Clayrose Internet Creations



------------------------------- ------------------------------- ------------------------------- ------------------------------- ------------------------------- ------------------------------- ------------------------------- ------------------------------- ------------------------------- -------------------------------